Weather permitting, the right, eastbound lane of Riverside Drive at the Farrar Street Bridge will be closed beginning Monday, Sept. 25, to allow for repair of the bridge, which was damaged in April when the underside was struck by a roll-off truck.
The lane will be closed from Union Street Bridge Road to Highland Court. The repair will take several weeks to complete.